New asphalt, “new” ramps, and new murals


The new asphalt, looking beautiful (thank you David Coffin!), has cured for a few weeks so it’s ready for ramps.
Next Monday (6/28) starting at 9am we’ll be moving the ramps donated by the Town of Hinesburg onto the skatepark, putting them together the way Hinesburg Recreation Director Rocky Martin showed us when he visited last Tuesday. (See above photo and plans to the left.)
On Tuesday (6/29) Burlington artist Tooth will be on the park all day, demonstrating techniques as he paints murals onto the ramps. Come join in with him!
We’re continuing to fundraise for a skate-surface for the old asphalt, a public address system, and a new spine feature.
| Print article | This entry was posted by The Bristol Hub on June 24, 2010 at 9:42 pm, and is filed under Uncategorized. Follow any responses to this post through RSS 2.0. You can leave a response or trackback from your own site. |